SolarEdge SE-100K Three-Phase Synergy Manager 480V (Requires 3 Secondary Units).
The Three-Phase Synergy Manager, AC RSD, 100kW, with an operating temperature range of (-40° to 60°C) and 480V, includes a DC Safety Switch, AC/DC Surge Protection Device (SPD), multiple inputs, and string fusing.
Key Features:
- Pre-commissioning capability for automated validation of system components and wiring during installation, ensuring readiness before grid connection.
- Easy 2-person installation with a lightweight, modular design (each inverter consists of 2 or 3 Synergy units and 1 Synergy Manager).
- Independent operation of each Synergy unit, providing improved uptime and simplified serviceability.
Specifications
| Mechanical | Specification |
|---|---|
| Manufacturer Part Number | SE100K-US08IBNZ4 |
| Shipping Weight (Lb) | 39.6 |
| Shipping Dimensions (In) | 14.17 x 22.0 x 11.61 |
| Rated AC Active Output Power | 100,000 W |
| Maximum AC Apparent Output Power | 100,000 VA |
| AC Output Line Connections | 3W + PE, 4W + PE |
View the official product data sheet for detailed specifications and technical information. You can download it from the PDF viewer if needed.
View Data SheetView the manufacturer installation document in a new window. You can download it from the PDF viewer if needed.
No installation document is available for this product.View the product warranty document in a new window. You can download it from the PDF viewer if needed.
No warranty document is available for this product.Recommended Products
Ready to Power Your Future With Solarvion?
Source premium solar equipment, request B2B pricing, or contact our team for product availability and shipping support.
No Obligation · Response Within One Business Day